Demonstration Projects - Emissions Reduction Test Facility
ERTF Solvent Scrubbing Process - Equipment
Absorber column
10” NB (DN250)
4-off packed bed sections (with multiple
solvent feed inlet points)
Stripper column
8” NB (DN200)
4-off packed bed sections
Water Wash Column
8” NB (DN200)
1-off packed bed section
Heat exchangers
Gasketed (plate and frame)
Pumps
Duties met by triplex diaphragm pumps
for high head - low flow duties
Variable speed drives for efficiency and
ease of control 22
|
| |